Tuesday, December 25, 2012

What should pay attention to install the pipe filter


Web Design And Seo For www.china-webdesign.com
needle punched felt - China Manufacturer
Thank you for inquiry my needle punched felt, Tel:+86-576-83670886, Email:heading@headingfilter.com
http://www.headingfilter.com/pp-needle-punched-felt.html


The pipeline filter specifications chosen should match the installation of pipelines, two (or more) pipeline filter parallel request when the flow of the pipeline filters can not be satisfied pipeline installation, or do next filt er disposal.industrial felt

The pipe filter should device in the system to maintain, pipe filters, to import low pressure affect application, and therefore should be installed in the premises leaned pressure source.

Pipe filter should be installed in series in the pipeline system, stop inspection system for the protection of uninterrupted water supply, bypass the initiative system, the import and export of pipe filter and bypass interception with a ball valve should be set. Backflow check valve should export pipeline filter installed.

Selection mindful flow through the fully active pipeline filter the water temperature does not exceed its adaptation to temperature.

Installation site with three-phase 380V power frequency switching power (three-phase four-wire). The Pipeline Fire outfall no more than 5 meters to prevent back pressure.

DC systems Note the fil tering accuracy pretreatment, the pressure matters intermittent system.