Kick filter cleaning device filtering accuracy of 1.2mm, if you have special accuracy requirements, in order special instructions so special custom.
2, the installation, the direction of flow with the device orientation flag the same can not be loaded upside. Riser installed on the water should be from top to bottom.
3, the device is provided with a the recoil control valve, just install drain valve and outfall outfall, no need to draw a line bypass, non-stop recoil sewage.

2, installation guidelinesdust collection filter bags
1) cleaning is recommended to be installed near the pump.
2) cleaning day horizontal installation, but can also be mounted vertically, so will not be affected, it should be noted that the top of the host should not dripping phenomenon.
3) cleaning day installation indoors, in the outdoor air conditioning pumps, country cover water-resistant device.
3, the pressure to determine the level of
The device of conventional nominal pressure 1.0MPa, 1.6MPa two other pressure levels can be customized according to user requirements, orders must be specified in the contract nominal pressure.
4 Installation Notes
1) new equipment or fouling serious anti-corruption Ke mounted directly on the water processor.
2) serious scaling facilities should be cleaned after installation to prevent dirt clogging pipes lowered.
3) the installation and removal process should be taken not to host the force and damp.
4) the host part without professional license can not be allowed to play in the form, to prevent damage to the circuit, or the resulting consequences Company shall be excluded.

Run the Notes
1, the products manufactured before the technical inspection department to adjust the user does not have to be adjusted.
2, ordinary red light indicator for power indicator, green work light, where there is:industrial water filters
1) red light, green light is not lit, should be immediately shut down, notify the manufacturer or professional maintenance.
2) Red light, green light, indicating that the normal work can continue branch notify the manufacturer maintenance.
Sewage directly affect the results, we should strengthen the sewage management (≥ 5% of the total amount of sewage).
1) new equipment and equipment can be cleaned monthly sewage.
2) fouling equipment and systems should be weekly sewage, until the dirt Chuqing monthly sewage.